Detector, dewar and Arcon work, Ramon Galvez H., June 2002
CCD Dewar
-
Leak tested.
-
Determine gasification rate = 1.8 SCFH
-
Determine As Is Thermal Radiation Load = 3.8 Watts
-
New vacuum valve installed.
CCD & Arcon
-
Dark Current = 1.43 e/pix/hr ; Conditions = Bin 2x2, Gain 1, all sorrounding rooms and dome lights ON.
-
Dark Current = 0.88 e/pix/hr ; Conditions = Bin 2x2, Gain 1, all lights OFF.
-
New ADC bd prepared + tested ( s/n4 new batch). Got no more missing codes around 15k ADU.
-
Video original and spare bd. Noise comparison : both at 3e.
-
Not a single crash. Neither during exposure tests nor while downloading.
Dewar Cryogenics
-
A new LN2 refill and solidification device was designed. I had the good advices from Brooke on this. Tested in the lab and, along with Daniel, on the telescope.
-
Cryo Status : 24hrs hold time, one daily refill. Cryo system ‘tuned’; as a result the refill is done without necessity of vacuum valve control.