Ramon will check out the vacuum and prepare a new molecular sieve during the week of 21/3
On the next engineering night, we will measure the rotation near the equator and adjust x_offset and y_offset by going to the pole.
Rolando is looking at exactly how big the axial alignment error is.
Can Roberto check the optical alignment soon?
Rolando will add a fix to the code
First, Hernan, Ricardo, Knut, Daniel, and Patricio will write up a detailed set of procedures, hints, and tricks for doing the echelle setup
We want to investigate getting replacement ThAr lamps--Oscar will contact Kitt Peak to find out what they are using
Observer support will check out what is currently in the chimney.
Oscar and Knut will contact Kitt Peak about what lamps they have and who supplies them
Hernan, Oscar, Ricardo, Knut, Patricio will also make a web page listing all of our comparison lamp supplies
Andres and Ricardo will check out the z-limit switch and the general mechanical tuning of the gripper during the week of 21/3. Andres will also see whether a new z-limit switch design may be implemented before April 16, 2004.
The trouble with the erratic limit switch signals was solved by replacing the spare Galil with the original Galil. Trouble is that the original Galil had some problems of its own, such as getting lost and producing "x-y stage not at destination" errors. The Galil boxes have been sent back to the company twice for repair, but have been returned with the statement that there is nothing wrong with them. Gale will ask Galil for a quote on a new replacement.
FIXED after David changed the values and Rolando incorporated the fix into automated software.