Date:
Saturday, May 21, 2016
Telescope:
CTIO Blanco 4-m
Submitter:
Tim Abbott
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
Alberto Alvarez
Also Present:
Rodrigo Hernandez
Problems:
None.
Program:
Proposal:
2013B-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
11.5
Time lost other:
0.0
Description:
DECam/Blanco engineering
Primary Investigator:
Alistair Walker
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2016-05-21 | 0.0 | 0.0 | 0.0 | 11.5 | 0.0 | 11.5 |
Clouded out...