Date:
Monday, January 25, 2016
Telescope:
CTIO Blanco 4-m
Submitter:
David James
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
Claudio Aguilera
Also Present:
Katelyn Allers, Everett Schlawin
Problems:
Usual issues with Commissioning/Engineering of a new instrument: see comments field below.
Program:
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
8.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
ARCoIRIS Engineering
Primary Investigator:
David James
Email:
Institution:
CTIO
Instrument:
CTIO 4m ArCoIRIS
Organization:
NOAO
Total Program Time:
8
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2016-01-25 | 0.0 | 8.0 | 0.0 | 0.0 | 0.0 | 8 |
Night three (of four) of the last ARCoIRIS Commissioning/Engineering: tests are on-going.