Date:
Thursday, December 10, 2015
Telescope:
CTIO Blanco 4-m
Submitter:
Dale Mudd
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Claudio Aguilera
Problems:
Failure to prepare the following component for the next exposure: DECAL
Components not ready for exposure: DECAL
Interlock SISPI (OCS) is now broken
Interlock DECAM (SISPI) is now broken.
(This was all fixed by restarting the machine for DECAL, lost 9 minutes on sky)
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
7.0
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Joshua Frieman
Email:
Institution:
DES
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
7.25
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2015-12-10 | 7.0 | 0.0 | 0.25 | 0.0 | 0.0 | 7.25 |
http://des-ops.fnal.gov:8080/nightsum/nightsum-2015-12-10/nightsum.html