Date:
Wednesday, May 20, 2015
Telescope:
CTIO Blanco 4-m
Submitter:
David James
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
Claudio Aguilera
Also Present:
David Herrera
Problems:
TCS failure at about 01:20 local ... about 16-minutes lost.
TCS failure at 01:42 local ... about 35 minutes lost.
Pressing "Cover with Block" crashes SISPI -- the safe button does however work.
Program:
Proposal:
2013B-0536
Target of Oportunity:
No
Time Observed:
10.5
Time Engineering:
0.0
Time lost technical:
0.75
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam NEO survey
Primary Investigator:
Lori Allen
Email:
Institution:
NOAO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11.25
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2015-05-20 | 10.5 | 0.0 | 0.75 | 0.0 | 0.0 | 11.25 |
None.