Date:
Saturday, April 18, 2015
Telescope:
CTIO Blanco 4-m
Submitter:
Lori Allen
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Claudio Aguilera
Also Present:
David James
Problems:
None. Nada. Nichts.
Program:
Proposal:
2013B-0536
Target of Oportunity:
No
Time Observed:
10.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam NEO
Primary Investigator:
L. Allen
Email:
Institution:
NOAO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
10.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2015-04-18 | 10.5 | 0.0 | 0.0 | 0.0 | 0.0 | 10.5 |
Data transfer off Tololo still sluggish (200 images pending at end of night).