Date:
Friday, March 13, 2015
Telescope:
CTIO Blanco 4-m
Submitter:
Gustavo Medina
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
Alberto Alvarez
Also Present:
Tim Abbott, Leonardo Paredes, David Rojas
Problems:
Problems with SISPI.
Program:
Proposal:
2015A-0608
Target of Oportunity:
No
Time Observed:
5.0
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
0.0
Time lost other:
0.0
Description:
HiTS
Primary Investigator:
F. Forster
Email:
Institution:
Universidad de Chile
Instrument:
CTIO 4m DECam
Organization:
Chile
Total Program Time:
5.5
Proposal:
2013B-0440
Target of Oportunity:
No
Time Observed:
5.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
SMASH
Primary Investigator:
D. Nidever
Email:
Institution:
U. Michigan
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2015-03-13 | 10.0 | 0.0 | 0.5 | 0.0 | 0.0 | 10.5 |
SISPI problems are detailed in the corresponding technical reports.