Date:
Sunday, January 4, 2015
Telescope:
CTIO Blanco 4-m
Submitter:
David James
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
Alberto Alvarez
Problems:
Clouds ... one DECalS machine crash.
Program:
Proposal:
DECam Engineering
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
6.5
Time lost technical:
1.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Engineering program for DECam
Primary Investigator:
Alistair Walker
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
7.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2015-01-04 | 0.0 | 6.5 | 1.0 | 0.0 | 0.0 | 7.5 |
Engineering night.
New pointing model testing with new hexapod LUTs - successfully completed (see elog #233896).
One set of starflats (g-filter) achieved before thickening cirrus rolled in (see elog #233899).
An interrupted, partially-completed no-filter DECal was achieved (see elog #233902).