Date:
Monday, March 3, 2014
Telescope:
CTIO Blanco 4-m
Submitter:
Santiago Gonzalez
Submitter Email:
Observer Support:
Alberto Alvarez
Night Assistant:
Hernan Tirado
Problems:
UTC 3:03 SHUTTER PROBLEM. Fine after resetting.
Program:
Proposal:
2014A-0608
Target of Oportunity:
No
Time Observed:
9.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Shock breakout detections with DECam
Primary Investigator:
F. Forster
Email:
Institution:
Universidad de Chile
Instrument:
CTIO 4m DECam
Organization:
Chile
Total Program Time:
9
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2014-03-03 | 9.0 | 0.0 | 0.0 | 0.0 | 0.0 | 9 |
None.