Date:
Monday, February 10, 2014
Telescope:
CTIO Blanco 4-m
Submitter:
Haojing Yan
Submitter Email:
Observer Support:
Javier Rojas
Night Assistant:
Manuel Hernandez
Also Present:
Kathy Vivas
Problems:
During the daytime calibration (at around 4:40pm) there was a shutter hardware problem. The telescope support staff reset the shutter and solved the problem.
Program:
Proposal:
2014A-0348
Target of Oportunity:
No
Time Observed:
8.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam z and Y-band Imaging of the H-ATLAS SDP Field
Primary Investigator:
Haojing Yan
Email:
Institution:
University of Missouri-Columbia
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
8.5
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2014-02-10 | 8.5 | 0.0 | 0.0 | 0.0 | 0.0 | 8.5 |
A quite clear night, though non-photometric.