Date:
Monday, November 25, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
Alberto Alvarez
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Alberto Alvarez
Problems:
From the experience of two previous nights and afternoon tests, we knew the hexapod system was not working properly.
Techinal problems didn't allow us to do any observation during the third night of the run.
The scientific goals of the program are sevely compromoised and we see no solution in the short term.
Astronomer didn't like it the idea of lossing three nights of his run, but he understand how serious is the problem.
Program:
Proposal:
2013B-0613
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
0.0
Time lost technical:
8.5
Time lost weather:
0.0
Time lost other:
0.0
Description:
Fornax cluster
Primary Investigator:
Roberto Munoz
Email:
Institution:
Pontificia Universidad Catolica de Chile
Instrument:
CTIO 4m DECam
Organization:
Chile
Total Program Time:
8.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-11-25 | 0.0 | 0.0 | 8.5 | 0.0 | 0.0 | 8.5 |
The nigh started with no clouds and no thick clouds were visible during the night (visual inspection). We don't have an estimate of the seeing.
The wind was fast at the beggining of the night.