Date:
Thursday, November 21, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
Arnau Pujol
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
Alberto Alvarez
Also Present:
Kevin Reil, Marisa March, David Rojas
Problems:
Problems with server1 and server3 that stopped us observing. We re-started server1 and server3, and we realised that this would take longer that the night, so for safety we closed the dome, we covered the mirrors and powered down monsoon crates 1, 2 & 3, under the advise of CTIO and DES staff.
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
4.0
Time Engineering:
0.0
Time lost technical:
3.75
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES Survey
Primary Investigator:
Josh Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
N/A
Total Program Time:
7.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-11-21 | 4.0 | 0.0 | 3.75 | 0.0 | 0.0 | 7.75 |
None.