Date:
Wednesday, November 20, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
Kevin Reil
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
Claudio Aguilera
Problems:
Readout1 machine needed reboot during afternoon flats. Second set of flats/calibrations finished before observing started
Single DECam shutter event. Telopos fixed with a click or two.
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
7.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Frieman
Email:
Institution:
DES
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
7.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-11-20 | 7.75 | 0.0 | 0.0 | 0.0 | 0.0 | 7.75 |
0.91" median delivered PSF on DECam with 0.13 rms.
Clouds limited to the horizon only and diminished through the night.
Excellent night