Date:
Tuesday, October 22, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
Alistair Walker
Submitter Email:
Observer Support:
Mauricio Rojas
Night Assistant:
Claudio Aguilera
Also Present:
Javier Rojas, Tom, Diehl, DES Observers for tomorrow
Problems:
It took some time to coax DECam into life, two separate power cycles of the Monsoon controllers to clear hardware latch-ups and several SISPI restarts. The dry air flow to C5 was increased (33% flow increase), this reduced the measured humidity at the FCM to below 1%. A few SISPI interlocks broke now and then, image builders had to be restarted was the most common. See Elog for details.
Program:
Proposal:
Engineering
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
9.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam checkout
Primary Investigator:
Alisair Walker
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
N/A
Total Program Time:
9
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-10-22 | 0.0 | 9.0 | 0.0 | 0.0 | 0.0 | 9 |
None.