Date:
Monday, June 3, 2024
Telescope:
CTIO Blanco 4-m
Submitter:
Dustin Lang
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Alberto Alvarez
Also Present:
Ann Elliott, Alfredo Zenteno, Arjun Dey (zoom)
Problems:
None.
Program:
Proposal:
2023B-184194
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
11.5
Time lost other:
0.0
Description:
IBIS
Primary Investigator:
Dey & Schlegel
Email:
Institution:
NOAO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2024-06-03 | 0.0 | 0.0 | 0.0 | 11.5 | 0.0 | 11.5 |
Ann and Hernan took advantage of the poor weather to do some engineering