Proposal:
2023B-184194
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
11.5
Time lost other:
0.0
Description:
IBIS
Primary Investigator:
Dey & Schlegel
Email:
Institution:
NOAO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11.5
Ann and Hernan took advantage of the poor weather to do some engineering