Date:
Wednesday, November 8, 2023
Telescope:
CTIO Blanco 4-m
Submitter:
Yifei Luo (first half) and Tanveer Karim (second half)
Submitter Email:
Observer Support:
Guillermo Damke
Night Assistant:
Claudio Aguilera
Also Present:
Konstantina Boutsia
Problems:
DECam failed twice (~10min in total).
Second half:
DECam hexapod needed to be reset once.
Program:
Proposal:
2020B-0288
Target of Oportunity:
No
Time Observed:
3.5
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Description:
The Merian Survey
Primary Investigator:
Alexie Leauthaud
Email:
Institution:
UCSC
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
3.75
Proposal:
2014B-0404
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
4.25
Time lost other:
0.0
Description:
DECam Legacy Survey
Primary Investigator:
David Schlegel
Email:
Institution:
Lawrence Berkeley National Laboratory
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4.25
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2023-11-08 | 3.5 | 0.0 | 0.25 | 4.25 | 0.0 | 8 |
None.
Second half:
The entire night was cloudy and we did not get any science exposures.