Date:
Monday, May 1, 2023
Telescope:
CTIO 1.5-m
Submitter:
Rodrigo Hernandez
Submitter Email:
Observer Support:
None
Night Assistant:
Rodrigo Hernandez
Problems:
At the end of the night , the program was stopped due to a desyncronization issue between dome and telescope. However , the problem was resolved , and
the program could continue.
Program:
Target of Oportunity:
No
Time Observed:
10.0
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Total Program Time:
10.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2023-05-01 | 10.0 | 0.0 | 0.5 | 0.0 | 0.0 | 10.5 |
The objects HD193901 and RKS2008+0640 were not observed
The rest of the observing program was finished without problems.