Date:
Thursday, March 10, 2022
Telescope:
CTIO Blanco 4-m
Submitter:
Erik Wasleske
Submitter Email:
Observer Support:
Jacqueline Seron
Night Assistant:
Alberto Alvarez
Also Present:
Alfredo
Problems:
At 07:49UT, a short power outage caused all system to be restarted. The queue was then empty and calibration exposure was taken. This resulted in about 20 minutes of lost time.
Program:
Proposal:
2021B-0325
Target of Oportunity:
No
Time Observed:
2.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECAT
Primary Investigator:
Armin Rest
Email:
Institution:
Carnegie Institution of Washington
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
2.5
Proposal:
2020B-0288
Target of Oportunity:
No
Time Observed:
7.5
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Description:
Merian Survey
Primary Investigator:
Leauthaud
Email:
Institution:
University of California, Santa Cruz
Instrument:
CTIO 4m DECam
Total Program Time:
7.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2022-03-10 | 10.0 | 0.0 | 0.25 | 0.0 | 0.0 | 10.25 |
None.