Date:
Wednesday, December 22, 2021
Telescope:
CTIO Blanco 4-m
Submitter:
Kathy Vivas
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
Claudio Aguilera
Also Present:
Clara Martínez-Vázquez, Elana Urbach
Problems:
The scan of filter N540 failed. Temperature of the DECal system went too high shortly after the start of the scan. The liquid in the cooling system seem to be not working (liquid is not flowing). After some attempts to fix it, with no success, and given that the temperature was still high, I decided to call the eng off and go to the sky to observe the DELVE program. I (Kathy) will coordinate with Esteban when to do proper maintenance of the system.
Program:
Proposal:
2013A-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
1.5
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Engineering
Primary Investigator:
Alistair Walker
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
1.5
Proposal:
2019A-0305
Target of Oportunity:
No
Time Observed:
2.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DELVE Survey
Primary Investigator:
Drlica-Wagner
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
2.5
Proposal:
2021B-0325
Target of Oportunity:
No
Time Observed:
4.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Photometric Time Series of Carinae's Great Eruption
Primary Investigator:
Armin Rest
Email:
Institution:
STSCI
Instrument:
CTIO 4m DECam
Total Program Time:
4
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2021-12-22 | 6.5 | 1.5 | 0.0 | 0.0 | 0.0 | 8 |
None.