Date:
Thursday, November 22, 2018
Telescope:
CTIO Blanco 4-m
Submitter:
Clara Martínez
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Claudio Aguilera
Also Present:
Jackie Serón and Humberto Orrego
Problems:
No on-sky work done due to instrument problems.
Program:
Proposal:
2013A-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
7.75
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Engineering test
Primary Investigator:
Walker
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
7.75
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2018-11-22 | 0.0 | 7.75 | 0.0 | 0.0 | 0.0 | 7.75 |
None.