Date:
Thursday, September 27, 2018
Telescope:
CTIO Blanco 4-m
Submitter:
Anqi Chen
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Claudio Aguilera
Also Present:
Jacqueline Seron
Problems:
DECal hang for about 45 min in the middle of Y band sequence. had to restart it, and was not completed by the end of the night
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
11.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Josh Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2018-09-27 | 0.0 | 0.0 | 0.0 | 11.0 | 0.0 | 11 |
http://des-ops.fnal.gov:8080/nightsum/nightsum-2018-09-27/nightsum.html