Date:
Thursday, June 28, 2018
Telescope:
CTIO 1.5-m
Submitter:
Rodrigo Hinojosa
Submitter Email:
Observer Support:
None
Night Assistant:
Rodrigo Hinojosa
Problems:
Several times along the night, I had problems with the synchronization between the dome and the telescope. I restarted the dome azimuth in the dome init position each time.
At 09:05 UT the dome got crazy, it started to rotate without stopping, I had to turnoff the dome to stop its motion. I do not know the reason of this failure. Due to this technical problem I finished observations.
It was not possible to close the dome ventilation door 20 completely.
Program:
Target of Oportunity:
No
Time Observed:
10.5
Time Engineering:
0.0
Time lost technical:
1.5
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
12
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2018-06-28 | 10.5 | 0.0 | 1.5 | 0.0 | 0.0 | 12 |
TELOPS: Please check the dome, it is crazy…
Due to clouds along the night, the most of targets were observed with variable signal.