Date:
Wednesday, June 13, 2018
Telescope:
CTIO 1.5-m
Submitter:
Rodrigo Hinojosa
Submitter Email:
Observer Support:
None
Night Assistant:
Rodrigo Hinojosa
Problems:
At the beginning of the night, I performed a general inspection to check for some problem caused by the recent storm. The handset presented a problem with the focus button, it was solved by Javier Rojas.
At 09:00 UT I had problems with the synchronization between the dome and the telescope, I restarted the dome azimuth in the dome init position.
Program:
Target of Oportunity:
No
Time Observed:
10.5
Time Engineering:
0.0
Time lost technical:
1.5
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
12
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2018-06-13 | 10.5 | 0.0 | 1.5 | 0.0 | 0.0 | 12 |
The program was completed successfully + HIP088962.