Date:
Friday, March 2, 2018
Telescope:
CTIO Blanco 4-m
Submitter:
Steven Silverberg
Submitter Email:
Observer Support:
Sean Points
Night Assistant:
Jackie Seron
Problems:
Issue removing mirror cover at start of night--delayed by 45 minutes. Additional issues setting zero point after a rotator angle reset. ¨M1 cover lock pin mechanism needs adjustement; to be done tomorrow [3/3].¨
Program:
Proposal:
2018A-0922
Target of Oportunity:
No
Time Observed:
8.5
Time Engineering:
0.0
Time lost technical:
1.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Steven Silverberg
Email:
Institution:
University of Oklahoma
Instrument:
CTIO 4m ArCoIRIS
Organization:
NOAO
Total Program Time:
9.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2018-03-02 | 8.5 | 0.0 | 1.0 | 0.0 | 0.0 | 9.5 |
Apart from mirror cover issue, straightforward night.