Date:
Tuesday, November 8, 2016
Telescope:
CTIO Blanco 4-m
Submitter:
Michael Medford
Submitter Email:
Observer Support:
Rodrigo Hernandez
Night Assistant:
Alberto Alvarez
Problems:
4MAP down at beginning of night during standards. Alberto restarted it, and it resumed functioning ~20 minutes later.
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
8.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
The Dark Energy Survey
Primary Investigator:
Frieman
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Total Program Time:
8
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2016-11-08 | 8.0 | 0.0 | 0.0 | 0.0 | 0.0 | 8 |
None.