Program 1

Primary tabs

Proposal: 
2013A-0400
Target of Oportunity: 
No
Time Observed: 
5.25
Time Engineering: 
0.0
Time lost technical: 
0.5
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
A Pilot DECam Time-Domain Survey
Primary Investigator: 
Josh Bloom
Institution: 
U.Berkeley
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
5.75