Program 1

Primary tabs

Proposal: 
2012B-9999
Target of Oportunity: 
No
Time Observed: 
0.0
Time Engineering: 
10.5
Time lost technical: 
1.5
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
DECam & telescope engineering
Primary Investigator: 
A. Walker
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
12