Program 1

Primary tabs

Proposal: 
2013A-0704 and 2013A-0741
Target of Oportunity: 
No
Time Observed: 
10.5
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Primary Investigator: 
Wood and Schlegel
Institution: 
CTIO
Total Program Time: 
10.5