Program 595

Primary tabs

Proposal: 
vDLKISJX
Target of Oportunity: 
No
Time Observed: 
4.0
Time Engineering: 
9.0
Time lost technical: 
4.0
Time lost weather: 
8.25
Time lost other: 
11.0
Description: 
I'm a partner in <a href=" https://moultonstudio.com/building-high-quality-links-why-its-important-more-than-ever/srytffs1_400x400/ ">synthroid 100 mcg tablet</a> "Instead of looking at 10 stars to look for a single potentially habitable planet, we now
Primary Investigator: 
ArzKUuKdGor
Institution: 
EPFL
Instrument: 
CTIO 4m Hydra
Organization: 
Chile
Total Program Time: 
36.25