Program 368

Primary tabs

Proposal: 
GrrNYYECyiSlaDnem
Target of Oportunity: 
No
Time Observed: 
4.75
Time Engineering: 
1.25
Time lost technical: 
2.75
Time lost weather: 
1.5
Time lost other: 
10.0
Description: 
A packet of envelopes http://uvan.us/54523/nissan-500z.html can i take cialis and levitra at the same time They got a nice break last year with Sale and Cardiff in their group which helped them progress. I can see them reverting to European type a little
Primary Investigator: 
waAxoJCi
Institution: 
Instituto de Astrofisica de Canarias
Instrument: 
CTIO 1.0m CCD Direct
Organization: 
Brazil
Total Program Time: 
20.25