Program 1

Primary tabs

Proposal: 
2013A-0327
Target of Oportunity: 
No
Time Observed: 
2.0
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
6.5
Time lost other: 
0.0
Description: 
Light Echoes
Primary Investigator: 
Armin Rest
Institution: 
STSCI
Instrument: 
CTIO 4m DECam
Organization: 
N/A
Total Program Time: 
8.5