Program 1

Primary tabs

Proposal: 
2012B-0003
Target of Oportunity: 
No
Time Observed: 
3.75
Time Engineering: 
0.25
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
des sv
Primary Investigator: 
Frieman
Institution: 
Fermilab
Instrument: 
CTIO 4m DECam
Total Program Time: 
4