Program 2

Primary tabs

Proposal: 
2012B-0363
Target of Oportunity: 
No
Time Observed: 
4.0
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
Time Domain survey
Primary Investigator: 
Bloom
Institution: 
U.Berkeley
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
4