Program 99

Primary tabs

Proposal: 
aNUoYdejLDwm
Target of Oportunity: 
No
Time Observed: 
0.0
Time Engineering: 
11.5
Time lost technical: 
12.5
Time lost weather: 
2.75
Time lost other: 
9.75
Description: 
Could I make an appointment to see ? <a href=" http://collegeletterpress.org/jid120 ">シアリス 通販 最速</a>
Primary Investigator: 
bHdjoFyMa
Institution: 
University of Rochester
Instrument: 
CTIO 4m RcSpect
Organization: 
MSU
Total Program Time: 
36.5