Program 2

Primary tabs

Proposal: 
2012B0-0624
Target of Oportunity: 
No
Time Observed: 
0.5
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
3.5
Time lost other: 
0.0
Description: 
Service Observing by A. Wal;mer
Primary Investigator: 
Aaron Robotham
Instrument: 
CTIO 4m DECam
Total Program Time: 
4