Program 21

Primary tabs

Proposal: 
zSftDfHV
Target of Oportunity: 
No
Time Observed: 
11.0
Time Engineering: 
3.75
Time lost technical: 
6.0
Time lost weather: 
3.5
Time lost other: 
9.0
Description: 
I'm sorry, I'm not interested <a href=" https://www.drugonsale.com#truly ">cialis</a> "I recognise that strong rail links across the country are important drivers in our economic recovery, that is why we are pushing ahead with the biggest programmes of r
Primary Investigator: 
CMkcGZQSCkANdptaM
Institution: 
Institute of Astronomy, Cambridge
Instrument: 
SOAR 4m Phoenix
Organization: 
Brazil
Total Program Time: 
33.25