Program 1

Primary tabs

Proposal: 
2012B-9999
Target of Oportunity: 
No
Time Observed: 
0.0
Time Engineering: 
8.0
Time lost technical: 
1.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
DECam commissioning, TCS pointing map
Primary Investigator: 
Tim, Alistair
Institution: 
NOAO
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
9