Program 2

Primary tabs

Proposal: 
2026A-942051
Target of Oportunity: 
yes
Time Observed: 
1.0
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
ToO followup Rubin
Instrument: 
CTIO 4m DECam
Total Program Time: 
1