Program 2

Primary tabs

Proposal: 
2025B-485252
Target of Oportunity: 
yes
Time Observed: 
0.5
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
ToO followup for S250830bp
Primary Investigator: 
Soares-Santos
Institution: 
University of Zurich
Instrument: 
CTIO 4m DECam
Total Program Time: 
0.5