Program 1

Primary tabs

Proposal: 
SMARTS/CHIRON
Target of Oportunity: 
No
Time Observed: 
6.5
Time Engineering: 
0.0
Time lost technical: 
2.0
Time lost weather: 
0.0
Time lost other: 
0.0
Instrument: 
CTIO 1.5m Echelle
Total Program Time: 
8.5