Program 1

Primary tabs

Proposal: 
2024B-388081
Target of Oportunity: 
No
Time Observed: 
6.75
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.5
Time lost other: 
0.0
Description: 
Wide Fast Deep with DECam
Primary Investigator: 
Peter Nugent
Institution: 
Lawrence Berkeley National Laboratory
Instrument: 
CTIO 4m DECam
Organization: 
N/A
Total Program Time: 
7.25