Program 1

Primary tabs

Proposal: 
2024A-941948
Target of Oportunity: 
No
Time Observed: 
11.5
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
Deep Drilling in the Time Domain with DECam
Primary Investigator: 
Peter Nugent
Total Program Time: 
11.5