Program 1

Primary tabs

Proposal: 
2021A-0124
Target of Oportunity: 
No
Time Observed: 
3.0
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.25
Time lost other: 
0.0
Description: 
Is Crater II disrupting?
Primary Investigator: 
K. Vivas
Institution: 
NOIRLab
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
3.25