Program 1

Primary tabs

Proposal: 
NEWFIM Eng/SV
Target of Oportunity: 
No
Time Observed: 
6.75
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
2.0
Time lost other: 
0.0
Description: 
NEWFIRM Eng/SV
Primary Investigator: 
Points
Institution: 
CTIO
Instrument: 
CTIO 4m Newfirm
Organization: 
NOAO
Total Program Time: 
8.75