Program 2

Primary tabs

Target of Oportunity: 
No
Time Observed: 
0.0
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
5.5
Time lost other: 
0.0
Primary Investigator: 
Trilling
Instrument: 
CTIO 4m DECam
Total Program Time: 
5.5