Program 1

Primary tabs

Proposal: 
2017B-0905
Target of Oportunity: 
No
Time Observed: 
9.75
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
SLSN in epoch of reionization
Primary Investigator: 
Jeremy Mould
Institution: 
Swinburne University of Technology
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
9.75