Program 1

Primary tabs

Target of Oportunity: 
No
Time Observed: 
7.75
Time Engineering: 
0.0
Time lost technical: 
0.75
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
DECam SV
Primary Investigator: 
dara norman
Institution: 
NOAO
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
8.5