Program 15

Primary tabs

Proposal: 
QjmwMDUqSlUMrTCg
Target of Oportunity: 
No
Time Observed: 
8.25
Time Engineering: 
10.25
Time lost technical: 
7.0
Time lost weather: 
3.25
Time lost other: 
7.75
Description: 
When do you want me to start? http://www.tlc.com.pe/en/the-vdo-workshop-network-at-the-service-of-the-transport-professional-to-guarantee-the-activity/ stromectol ivermectin Paddy Hamner was the secretary at the time, and he was clearly a little perturb
Primary Investigator: 
VXYoxtWSchv
Institution: 
Universidad de Valparaiso
Instrument: 
SOAR 4m Osiris
Organization: 
NOAO
Total Program Time: 
36.5